BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//ChamberMaster//Event Calendar 2.0//EN
METHOD:PUBLISH
X-PUBLISHED-TTL:P3D
REFRESH-INTERVAL:P3D
CALSCALE:GREGORIAN
BEGIN:VEVENT
DTSTART:20131213T173000Z
DTEND:20131213T190000Z
X-MICROSOFT-CDO-ALLDAYEVENT:FALSE
SUMMARY:Specifying Trenchless Sewer Rehabilitation Projects
DESCRIPTION:Prior to the early 1970s the vast majority of sewer rehabilitation projects incorporated conventional dig and replace methods.  Trenchless rehabilitation methods have been growing in popularity as municipalities are asked to maintain their even aging infrastructure with reduced budgets and pressure to reduce infiltration and inflow.  This presentation will introduce a number of trenchless rehabilitation techniques beginning with sewer cleaning and televising followed by cured-in-place pipe lining\, sectional lining\, and chemical grouting for main line sewers\, manholes\, and laterals. The presentation will focus on design criteria\, standards\, and items to consider when specifying your sewer rehabilitation project.\n\n \n\nSuggested specifications will be provided for:\n\n\n	\n		Cleaning and Televising\n	\n		Cured-in-Place Pipe (CIPP)\n	\n		Sectional Lining\n	\n		Chemical Grouting\n\nManhole Rehabilitation
X-ALT-DESC;FMTTYPE=text/html:<span style="font-size: 10pt\;"><span style="font-family: arial\,sans-serif\;"><span style="color: black\;">Prior to the early 1970s the vast majority of sewer rehabilitation projects incorporated conventional dig and replace methods.&nbsp\; Trenchless rehabilitation methods have been growing in popularity as municipalities are asked to maintain their even aging infrastructure with reduced budgets and pressure to reduce infiltration and inflow.&nbsp\; This presentation will introduce a number of trenchless rehabilitation techniques beginning with sewer cleaning and televising followed by cured-in-place pipe lining\, sectional lining\, and chemical grouting for main line sewers\, manholes\, and laterals. The presentation will focus on design criteria\, standards\, and items to consider when specifying your sewer rehabilitation project.</span></span></span><br />\n&nbsp\;<br />\n<span style="font-size: 10pt\;"><span style="font-family: arial\,sans-serif\;">Suggested specifications will be provided for:</span></span><br />\n<ul>\n	<li>\n		<span style="font-size: 10pt\;"><span style="font-family: arial\,sans-serif\;">Cleaning and Televising</span></span></li>\n	<li>\n		<span style="font-size: 10pt\;"><span style="font-family: arial\,sans-serif\;">Cured-in-Place Pipe (CIPP)</span></span></li>\n	<li>\n		<span style="font-size: 10pt\;"><span style="font-family: arial\,sans-serif\;">Sectional Lining</span></span></li>\n	<li>\n		<span style="font-size: 10pt\;"><span style="font-family: arial\,sans-serif\;">Chemical Grouting</span></span></li>\n</ul>\n<span style="font-size: 10pt\;"><span style="font-family: arial\,sans-serif\;">Manhole Rehabilitation</span></span>
LOCATION:Marriott Minneapolis West 9960 Wayzata Blvd\, MN Minnetonka (952/544-4400) (Located on the north frontage road of I-394 between Hwy 169 & Hopkins Crossroad directly across from the ACEC/MN office) Click here to edit...
UID:e.9128.518
SEQUENCE:3
DTSTAMP:20260425T073322Z
URL:https://business.acecmn.org/events/details/specifying-trenchless-sewer-rehabilitation-projects-12-13-2013-518
END:VEVENT

END:VCALENDAR
