Friday Dec 18, 2015
11:30 AM - 1:00 PM CST
11:30 a.m. Registration
12:00 – 1:00 p.m. Luncheon & Program
Marriott Minneapolis West 9960 Wayzata Blvd, Minnetonka MN (952/544-4400)
(Located on the north frontage road of I-394 between Hwy 169 & Hopkins
Crossroad – directly across from the ACEC/MN office)
– This program is free to ACEC/MN members–
Lunch is being provided by CONTECH Construction Products
Most design engineers have a pretty good grasp on when and where to use the everyday precast or cast in place box culvert. The same could be said for a conventional clear span bridge. However, only a small percentage of the engineering community knows when and where a Structural Plate, Steel Truss, or Conspan Bridge System is a viable choice for a site. Believe it or not, many of the common concerns/misconceptions (durability, scour, agency acceptance, etc.), related to these structures, can be easily addressed.
Few projects go through their design life without discussions related to cost or schedule. If you could save your client money, time, and secure your place as their options-centric designer, would you do it? Contech Engineered Solutions provides a comprehensive array of plate, precast, and truss structures, with the best known brands available worldwide. Contech bridges – vehicular and pedestrian – fit a wide variety of applications, spanning distances from five to 300 feet and more. These brands include Contech Structural Plate, CON/SPAN, BEBO, Continental Bridge, Steadfast EXPRESS and U.S. Bridge. Experience, innovative thinking and exceptional service have put more than 78,000 Contech bridge installations, on the map worldwide, since 1931.
This seminar will cover the following topics:
Printed courtesy of www.acecmn.org/ – Contact the American Council of Engineering Companies of Minnesota for more information.
30 7th St. E., Suite 2725, St. Paul, MN 55101 – (952) 593-5533 – jcurry@acecmn.org